Refer attached document for building dimensions.
Note: only fixed cabinetry/air con unit are included. All other internal assets pictured will be removed.
All services/air con units will be disconnected by the Vendor.
The Buyer is responsible for all building dismantling and transport costs. Site must be left clean and tidy. It is not a requirement to remove steel stumps, these can be left onsite.
Vendor has advised Building is 2x Screwed Together Not One Full Building
REMOVAL IS REQUIRED NO LATER THAN 29TH MARCH.
Inspections by appointment.

